Use this checklist before the showing or specialist visit
Print this page or save it as a PDF. Record what is visible and which questions remain unresolved; do not use the checklist to diagnose a wall, enter an unsafe area, or replace a licensed inspector's or engineer's written findings.
Bring the same completed sheet and supporting records to every specialist or contractor so timing, deliverables, assumptions, and prices can be compared on the same basis.
Property, deadline, and contacts
Fill these fields before the visit. Do not assume that ordering an inspection or report extends a contractual deadline.
| Field | Write here |
|---|---|
| Property address | ____________________________________________ |
| SDCI development site / related addresses | ____________________________________________ |
| Mutual acceptance / contingency deadline | ____________________________________________ |
| Home inspector / visit and report date | ____________________________________________ |
| Structural reviewer / visit and deliverable date | ____________________________________________ |
| Geotechnical reviewer / visit and deliverable date | ____________________________________________ |
Wall and consequence
Make a simple site sketch and assign each wall or tier an identifier. Photograph only from safe, accessible locations.
- ☐ Every retaining wall, rockery, bulkhead, and visible tier is marked on the sketch.
- ☐ What each wall supports is recorded: landscaping, yard, driveway, building, sidewalk, utility, or neighboring property.
- ☐ Conditions above, below, and beside each wall are recorded.
- ☐ Face, top, toe, ends, drainage features, cracks, movement, and nearby loads are photographed where safe.
- ☐ Material, visible height, length, returns, stairs, railings, and nearby structures are recorded.
- ☐ Inaccessible, concealed, vegetated, or hazardous areas are listed instead of assumed acceptable.
Documents and public record
Match every record to a wall and construction phase. Write ‘unresolved’ when the match or status is uncertain.
- ☐ Seller-disclosure answers and attachments are compared with observations.
- ☐ SDCI development site, related addresses, and Site Characteristics Report are reviewed.
- ☐ Permit status is distinguished: application, issued, expired, withdrawn, canceled, completed, or finaled.
- ☐ Plans, calculations, corrections, inspections, complaints, and violations are reviewed when available.
- ☐ Earlier reports, surveys, contracts, invoices, photographs, warranties, and monitoring records are requested.
- ☐ Each document is matched to the correct wall and phase—or marked unresolved.
Sources: [4]
Site constraints
Notes: ________________________________________________________________________________
- ☐ ECA maps are treated as screening information, not a parcel-level stability diagnosis.
- ☐ Surface runoff, wall drainage, seepage, conveyance, outlet, overflow, and maintenance access are traced as far as evidence allows.
- ☐ Downspouts, irrigation, paving, catch basins, cleanouts, pumps, and visible pipes are recorded.
- ☐ Property line, easements, ownership evidence, wall footprint, and repair access are reviewed.
- ☐ Buildings, driveways, vehicles, trees, stored material, pools, and neighboring improvements near the wall are recorded.
- ☐ Excavation, equipment, stockpile, utility, neighbor-access, and right-of-way constraints are listed.
Specialist scope, timing, and price
Agreed deliverable and exclusions: ____________________________________________________________
- ☐ Home-inspection inclusions, exclusions, inaccessible areas, and referral language are identified.
- ☐ Each unresolved question is assigned to the appropriate structural, geotechnical, survey, drainage, title, legal, permit, or construction professional.
- ☐ The proposal identifies records review, site visit, participants, access, and travel assumptions.
- ☐ The written deliverable is defined: email, consultation letter, assessment, report, calculations, or permit-ready design.
- ☐ Further investigation and design are identified as included or separately authorized.
- ☐ Fee basis, reimbursables, follow-up, cancellation, expedited work, and additional-service rates are stated.
- ☐ Site-visit and written-deliverable dates leave time before the contractual deadline.
Decision packet
Questions that must be answered before the deadline: ________________________________________________
Decision / next action: ___________________________________________________________________________
- ☐ Written findings state observations, limitations, urgency, further investigation, and repair-design needs.
- ☐ Cost scenarios use the same assumptions for design, permits, temporary support, access, drainage, disposal, restoration, tax, and close-out.
- ☐ Immediate safety work, investigation, temporary stabilization, and permanent work are separated.
- ☐ Unknown conditions remain explicit instead of becoming a false single price.
- ☐ Unresolved conditions reach the buyer's broker or attorney before the applicable deadline.
Safety note
Do not excavate, remove support, redirect water, add loads, or enter an unstable area to complete this checklist. In the ‘Landslides’ section of SDOT's severe-weather page, the City says to move to higher, more stable ground when safe, stay away from a slide area, and call 911 if someone may be injured or trapped.
For the complete workflow, read Buying a Seattle home with a retaining wall.
Frequently asked questions
Is this checklist a retaining-wall inspection?
No. It organizes observations, records, deadlines, and questions. A licensed inspector or engineer defines and performs the professional scope required for the property.
Sources: [1]
Read the evidence workflow before using the checklist
The buyer guide explains what each record can and cannot establish and how to assign unresolved questions to the correct professional.
Official sources
- WAC 308-408C-010: Standards of Practice—Purpose and Scope ↗Washington State Legislature · Amended rule effective August 7, 2026 · Checked Sep 5, 2026
- WAC 308-408C-030: Exclusions and Limitations ↗Washington State Legislature · Amended rule effective August 7, 2026 · Checked Sep 5, 2026
- WAC 308-408C-170: Site ↗Washington State Legislature · Current section authority note: effective April 20, 2009 · Checked Sep 5, 2026
- Research a Project, Permit, or Property ↗Seattle Department of Construction & Inspections · Checked Sep 5, 2026
- Environmentally Critical Areas Code ↗Seattle Department of Construction & Inspections · Checked Sep 5, 2026
- Preparing for Severe Weather ↗Seattle Department of Transportation · See the ‘Landslides’ section · Checked Sep 5, 2026
This article is general research guidance, not engineering, legal or permitting advice. Site conditions and rules vary.