← All work typesSeattle permit evidence
Underpinning and helical piers
Seattle underpinning, helical-anchor, push-pier, and pin-pile permit evidence connected to foundations and retaining structures.
What this work is and when it enters the conversation
Underpinning transfers or supplements support beneath an existing foundation or retaining structure. Helical elements, push piers, pin piles, anchors, and other systems behave differently and depend on design loads, installation criteria, access, existing construction, utilities, and verified field response. Product names alone do not define a complete repair.
Matches require explicit underpinning, pier, pile-foundation repair, or helical-anchor language in a selected permit. Some records combine foundation and retaining-wall work; the official link is included so readers can see the stated scope instead of assuming every project was the same system.
- Documented settlement affects a foundation or supported wall
- Existing support must be transferred during adjacent work
- A structural and geotechnical evaluation selects deep support
- Access constraints favor a small-installation-footprint system
Seattle permit and site questions
Underpinning is engineered structural work; confirm design, inspection, and field-verification requirements in the approved permit.
Ask how installation reactions, vibration, utilities, and temporary support are addressed for the existing building.
A permit exemption is not an engineering conclusion, and a mapped environmental layer is not a property assessment. Confirm the current path with SDCI for the actual address, dimensions, loads, grading, and proposed construction.
Calculated from selected records
What appears in this dataset
3matching companies
4matching permits
4documented neighborhoods
2023–2025issue-year span
Among records with a positive declared cost, the observed range is $25,000 to $54,300. These are permit declarations, not bids, invoices, final costs, or price guidance.
Companies with a matching permit description
The company list is evidence, not endorsement. Each excerpt below is the exact public description used for the match; open the official record to inspect its context.
Construct repairs to existing retaining wall with helical anchors per plan. Review and process 7018832-CN under this permit.
7015480-CN · Nov 7, 2024 · West Queen Anne · $52,197
Open official Seattle record ↗Construct alterations to install push piers helical anchors and tie-rods to support existing retaining wall and foundation of single-family residence per plan.
6953194-CN · Jul 3, 2024 · Fremont · $54,300
Open official Seattle record ↗Construct site retaining wall & foundation repairs to existing one-family dwelling per plan
6941728-CN · Oct 1, 2023 · Stevens · $50,000
Open official Seattle record ↗Construct retaining walls and pin pile foundation repair to existing one-family dwelling per plan
6967982-CN · Feb 3, 2025 · Leschi · $25,000
Open official Seattle record ↗What to settle before signing
Comparable words in a permit do not make two properties comparable. Ask bidders to define exclusions and connect their proposed method to the site investigation and approved documents.
- Design loads, acceptance criteria, and the responsible engineer
- Installation logs, torque or load testing, and rejected-element procedure
- Connections to existing construction and temporary support
- Access openings, utilities, interior repair, and final documentation
Re-open the contractor’s current Washington registration, bond, and insurance record before a decision. Confirm that the legal entity and license on the contract match the entity whose evidence you reviewed here.
Official sources
- Retaining Walls & Rockeries ↗Seattle Department of Construction & Inspections
- Grading Permit ↗Seattle Department of Construction & Inspections