Construct alterations to ecology block retaining wall on site for single-family residence per plan.
6869556-CN · Completed · issued Nov 3, 2023 · Alki · $4,000Official Seattle record ↗Seattle permit evidence
Segmental and ecology block walls
Seattle segmental, ecology-block, and identified block retaining-wall permit evidence and scope-comparison guidance.
What this work is and when it enters the conversation
Segmental retaining walls rely on more than stacked faces. Depending on the system, compacted aggregate, leveling pads, drainage, reinforcement extending into retained soil, setbacks, curves, and the relationship between tiers all affect the wall. Large ecology blocks are a different product and should not be assumed to follow the same design details.
The evidence filter looks for explicit segmental, ecology block, or named block-wall language. A permit that only says retaining wall is not assigned to this category, even if the completed wall may have used blocks, because the public description does not establish that fact.
- The design team selects a mechanically stabilized earth system
- Adequate excavation and reinforcement length exist behind the face
- A modular face suits the geometry and finish requirements
- Drainage and surface-water routing can be integrated into the section
Seattle permit and site questions
SDCI’s published no-permit conditions address measured height, ECA status, and potential damage to adjoining property; verify all three for the proposed wall.
Ask the designer to identify the specific system and whether manufacturer details are sufficient for the site conditions.
A permit exemption is not an engineering conclusion, and a mapped environmental layer is not a property assessment. Confirm the current path with SDCI for the actual address, dimensions, loads, grading, and proposed construction.
Calculated from selected records
What appears in this dataset
Among records with a positive declared cost, the observed range is $4,000 to $26,855. These are permit declarations, not bids, invoices, final costs, or price guidance.
Compare companies with a matching permit description
The comparison is evidence, not endorsement. It shows each company’s matching permit count, documented neighborhoods, latest record, registration context, and exact public descriptions.
| Company | Selected permits | Documented neighborhoods | Latest match | Verification |
|---|---|---|---|---|
| Eagle Rock Landscaping Inc.WA #EAGLERL883J7 General contractor. Office listed in Seattle; 4 primary-scope Seattle permits observed since 2021. | 1 | Alki | Nov 3, 2023 | Active through Jan 14, 2027Full profile → |
View 1 selected permit record | ||||
| Stabuilt LLCWA #STABUL*782LN General contractor. Office listed in Lynnwood (North King / South Snohomish); 3 primary-scope Seattle permits observed since 2021. | 1 | Phinney Ridge | Dec 13, 2023 | Active through Jun 15, 2028Full profile → |
View 1 selected permit recordReplace existing concrete retaining wall with keystone block wall accessory to existing single family residence per plan. 6957919-CN · Issued · issued Dec 13, 2023 · Phinney Ridge · $26,855Official Seattle record ↗ | ||||
General contractor. Office listed in Seattle; 4 primary-scope Seattle permits observed since 2021.
- Selected permits
- 1
- Latest match
- Nov 3, 2023
- Documented neighborhoods
- Alki
View 1 selected permit record
Construct alterations to ecology block retaining wall on site for single-family residence per plan.
6869556-CN · Completed · issued Nov 3, 2023 · Alki · $4,000Official Seattle record ↗General contractor. Office listed in Lynnwood (North King / South Snohomish); 3 primary-scope Seattle permits observed since 2021.
- Selected permits
- 1
- Latest match
- Dec 13, 2023
- Documented neighborhoods
- Phinney Ridge
View 1 selected permit record
Replace existing concrete retaining wall with keystone block wall accessory to existing single family residence per plan.
6957919-CN · Issued · issued Dec 13, 2023 · Phinney Ridge · $26,855Official Seattle record ↗What to settle before signing
Comparable words in a permit do not make two properties comparable. Ask bidders to define exclusions and connect their proposed method to the site investigation and approved documents.
- Named wall system, design section, and reinforcement limits
- Compaction testing, drainage aggregate, fabric, pipe, and outlet
- Bearing preparation and handling of unsuitable or wet soil
- Finish samples, cap details, curves, steps, and restoration boundaries
Re-open the contractor’s current Washington registration, bond, and insurance record before a decision. Confirm that the legal entity and license on the contract match the entity whose evidence you reviewed here.