← All work types

Seattle permit evidence

Retaining wall replacement

Permit-backed Seattle retaining-wall replacement evidence and a practical checklist for comparing removal and reconstruction scopes.

What this work is and when it enters the conversation

Replacement removes enough of an existing wall to create a new retaining system. The hard questions often sit outside the face material: how soil is supported during demolition, whether excavation crosses a property line, where reinforcement can extend, and how drainage reaches a lawful outlet. Access for equipment and exported soil can materially change the construction plan.

A permit description that says replace, reconstruct, or remove and install new is the evidence threshold used here. Generic new-wall records are kept separate because they do not prove experience sequencing demolition around an occupied site or neighboring improvements.

  • Movement is too extensive for a defined local repair
  • Timber, rubble, or masonry components have broad deterioration
  • The existing geometry cannot support documented loads
  • Drainage cannot be corrected without opening the retained soil

Seattle permit and site questions

Measure height using SDCI’s published method from the bottom of the footing to the top of the wall.

Demolition, grading, surcharge, and ECA conditions may affect review even when a contractor describes the work as replacement in kind.

A permit exemption is not an engineering conclusion, and a mapped environmental layer is not a property assessment. Confirm the current path with SDCI for the actual address, dimensions, loads, grading, and proposed construction.

Calculated from selected records

What appears in this dataset

9matching companies
10matching permits
9documented neighborhoods
2022–2024issue-year span

Among records with a positive declared cost, the observed range is $15,000 to $100,000. These are permit declarations, not bids, invoices, final costs, or price guidance.

Companies with a matching permit description

The company list is evidence, not endorsement. Each excerpt below is the exact public description used for the match; open the official record to inspect its context.

Stabuilt LLC2 matching records

Replace existing concrete retaining wall with keystone block wall accessory to existing single family residence per plan.

6957919-CN · Dec 13, 2023 · Phinney Ridge · $26,855

Open official Seattle record ↗

Remove existing and install new retaining wall for a single-family residence per plan

6932339-CN · Nov 7, 2023 · Wallingford · $26,500

Open official Seattle record ↗

What to settle before signing

Comparable words in a permit do not make two properties comparable. Ask bidders to define exclusions and connect their proposed method to the site investigation and approved documents.

  • Existing-wall demolition and temporary earth support
  • Property-line survey and protection of neighboring improvements
  • Wall design assumptions, drainage details, and finish tolerances
  • Allowances for unsuitable soil, buried obstructions, and access repair

Re-open the contractor’s current Washington registration, bond, and insurance record before a decision. Confirm that the legal entity and license on the contract match the entity whose evidence you reviewed here.

Documented neighborhood intersections

These narrower pages exist only where at least two different active companies have matching permit descriptions in the same neighborhood.

Continue the research

Project intake

Describe the wall or slope question.

This independent intake is not routed to a particular profile company. Sending it does not create an endorsement or contractor relationship.

By sending, you agree to the privacy notice. For an immediate danger, leave the area and contact the appropriate emergency service.

Official sources

  1. Retaining Walls & RockeriesSeattle Department of Construction & Inspections
  2. Grading PermitSeattle Department of Construction & Inspections
  3. Environmentally Critical Areas CodeSeattle Department of Construction & Inspections