Quick answer

What supports the soil while the old wall is removed?

That question must be resolved for the construction stages, not only for the finished wall. Temporary shoring is support used to retain ground during excavation and construction. A replacement project may need it, or another professionally evaluated excavation arrangement, depending on the ground, nearby loads, available space and sequence. The old wall's height alone does not answer the question.

Before demolition, ask your project team for the temporary-work scope, responsible designer, required approvals, water-management plan and observation points. Seattle's geotechnical guidance explicitly includes shoring and construction sequencing. This guide helps an owner compare documents and responsibilities; the repair-or-replacement guide addresses the earlier decision about what work is needed.

Sources: [1], [2], [3]

A finished-wall drawing does not explain every construction stage

Replacing a wall changes the site before the new system is complete. The design discussion needs to address what is removed, what remains, the proposed excavation, and how ground and nearby property are supported between stages. Ask the team to identify those conditions on drawings and in the sequence rather than assuming the new wall detail explains them.

SDCI describes geotechnical reports that include retaining-wall and shoring recommendations, construction sequencing and erosion control. Agree on which questions your report and design scope must answer. A report written for another property may provide background, but SDCI normally expects a site- and project-specific report when one is requested for permit review.

Sources: [1]

Temporary and permanent components need clear labels

A soldier-pile arrangement uses spaced vertical piles with material between them, called lagging, to retain soil. Depending on the design, piles can act as cantilevers or use ground anchors called tiebacks. Temporary and permanent lagging have different design responsibilities in WSDOT's manual. The useful owner question is which elements serve during construction and which remain in the final system.

Ask for that distinction in your own plans and contract. If a temporary element is proposed to remain, ask the responsible designer to explain its final role, required documentation and maintenance implications. WSDOT's highway manual is technical background here; its dimensions, loads and service-life provisions are not specifications for your Seattle yard. The soldier-pile and tieback guide explains those systems further.

Sources: [8]

Request a coordinated temporary-work package

You do not need to choose an excavation method yourself to ask for a complete scope. Use this table in a preconstruction conversation. The applicable documents and observation requirements depend on the actual site, design and permit; the questions are an editorial planning checklist based on SDCI's published guidance.

Questions to resolve before wall demolition
TopicDocument or decision to requestWhy it matters to the owner
Existing ground and nearby featuresSite information and the investigation basisClarifies what is known about soil, water and the surroundings
Demolition and excavationDrawings and a construction sequence covering intermediate stagesShows what supports the site before the final wall is complete
Design responsibilityNamed professionals and coordination of temporary and permanent workIdentifies who resolves assumptions and proposed changes
Water and erosionTemporary collection, discharge and site-protection scopeKeeps temporary water management from becoming an unspecified extra
Observations and monitoringAssigned inspections, notification points and reporting contactsLets the team schedule checks while the relevant work is accessible
Transition to the final systemConditions for changing or removing temporary supportMakes the handover between construction stages explicit

Sources: [1], [5], [6]

Include neighboring property, utilities and access

Seattle's wall guidance makes potential damage to adjoining property or structures part of the permit decision, including damage during construction. A replacement near a boundary needs discussion of the excavation and work area, not just the final face. Show nearby buildings, utilities, paving and the boundary to the responsible professionals.

Resolve any proposed use of neighboring land and public right-of-way before accepting a scope that depends on it. Ask how equipment, deliveries and soil removal will fit the available access and how that affects the sequence. The property-line guide and limited-access guide cover those planning questions in more detail.

Sources: [2], [1]

Structural shoring changes the permit question

Do not assume a small final wall makes every part of its replacement permit-exempt. SDCI's grading guidance says structural shoring requires a construction/building permit, with grading as an element of that permit. Ask SDCI and the design team which permit path covers the proposed wall, excavation and shoring together.

The wall page separately describes a conditional construction-permit exemption based on full measured height, absence of an ECA and no adjoining-property damage. These pages address different parts of the work; neither is a blanket exemption for demolition and excavation. The Seattle permit guide provides the broader starting checklist.

Sources: [3], [2]

Plan temporary water management and the allowed season

Discuss runoff, water encountered in excavation, erosion control and discharge before the old drainage or wall is disturbed. Seattle's geotechnical guidance includes drainage, sequencing and erosion-control recommendations. Have the temporary and permanent scopes identify who handles each stage; the permanent drain detail alone may not explain the construction period.

SDCI requires a grading-season extension for rainy-season ground disturbance in landslide-prone areas and for projects with permit restrictions. Check the Special Inspection Authorization Letter for ‘Monitor Seasonal Grading.’ An extension application includes a construction schedule, site-protection plan and the geotechnical engineer's supporting letter. Follow the actual approval conditions; a contractor's available start date does not settle the allowed work period.

Sources: [1], [7]

Set observation points and a response to changed conditions

Director's Rule 5-2016 calls for geotechnical construction monitoring and addresses reporting departures from approved plans and significant geotechnical issues. It also addresses stability during and after construction. The Rule Viewer lists it as Active, but SDCI warns that older guidance may not reflect every current requirement. Confirm its application with the reviewer and responsible engineer.

Where special inspections are assigned, SDCI issues an authorization letter naming the agency and items. The owner selects and pays the agency. At the preconstruction meeting, ask when it must be notified, which observations precede covering work, and who contacts the design team and City when the actual site differs from the approved basis. Keep the resulting reports and issue resolutions together.

Sources: [4], [5]

Compare replacement prices with temporary work included

For each bid, ask whether demolition, temporary support, design coordination, water management, observations, removal or retention of temporary components, and restoration are included. Request the basis for allowances and the process for a changed condition. This is a procurement checklist derived from the construction and permit responsibilities above, not an agency-prescribed contract form.

Use one current document package for every bidder. A price that excludes required temporary work cannot be compared directly with one that includes it. Our cost-and-bid-scope guide explains comparable pricing, and the project timeline shows where design, approvals, observations and closeout fit.

Sources: [1], [3], [5]

How to organize temporary-work decisions before replacement

  1. Describe the existing site

    Collect available plans, wall and drainage information, proposed work, boundaries, utilities and nearby structures for the design team.

  2. Agree on the investigation scope

    Ask the responsible professionals what ground and groundwater information is needed for both intermediate stages and the final wall.

  3. Name the design responsibilities

    Identify who prepares temporary-work recommendations and drawings and coordinates them with the permanent design.

  4. Confirm the permits and season

    Resolve construction and grading requirements with SDCI, including any seasonal restriction or extension needed for the actual proposal.

  5. Hold the preconstruction discussion

    Review the sequence, water management, assigned inspections, notification points and response to conditions that differ from the design basis.

  6. Retain the transition and closeout record

    Keep approved changes, observation reports and records explaining what remains, what is removed and which final requirements were accepted.

Sources: [1], [3], [5], [6], [7]

Frequently asked questions

Does every wall replacement need temporary shoring?

Not every project uses the same support arrangement. The responsible professionals evaluate excavation, ground, water, loads, space and sequence. Ask how the site is supported during each stage; the final wall's height alone does not determine that scope.

Sources: [1], [2]

Can the contractor decide the temporary support after demolition?

Resolve the design responsibilities, construction sequence and applicable approvals before demolition. The contractor may have assigned design or construction responsibilities, but those must be coordinated with the ground recommendations, final wall design and permit requirements.

Sources: [1], [3]

Does a grading permit alone cover structural shoring?

SDCI's grading page says structural shoring requires a construction/building permit, and grading becomes an element of that permit. Confirm the exact permit path for your proposed excavation, shoring and wall with SDCI.

Sources: [3]

Who arranges special inspections of the temporary work?

SDCI's reviewer determines the assigned items. The owner nominates and pays the special-inspection agency, and the issued authorization letter identifies its scope. Coordinate required visits with the contractor and retain the field reports and final letter.

Sources: [5]

Compare a documented replacement scope

Use public records to research relevant companies, then discuss the temporary and permanent work using the same project documents.

Wall-replacement contractor recordsDecide between repair and replacement

Official sources

  1. Geotechnical (Soils) Reports ↗Seattle Department of Construction & Inspections · Checked Oct 5, 2026
  2. Retaining Walls & Rockeries ↗Seattle Department of Construction & Inspections · Checked Oct 5, 2026
  3. Grading Permit ↗Seattle Department of Construction & Inspections · Checked Oct 5, 2026
  4. Director's Rule 5-2016: General Duties and Responsibilities of Geotechnical Engineers ↗Seattle Department of Construction & Inspections · Effective May 2, 2016; Rule Viewer lists Active. SDCI warns that older guidance may not reflect every current requirement. · Checked Oct 5, 2026
  5. Special Inspections ↗Seattle Department of Construction & Inspections · Checked Oct 5, 2026
  6. Construction Inspections ↗Seattle Department of Construction & Inspections · Checked Oct 5, 2026
  7. Grading Season Extensions ↗Seattle Department of Construction & Inspections · Checked Oct 5, 2026
  8. Bridge Design Manual Chapter 8: Walls and Buried Structures ↗Washington State Department of Transportation · M 23-50.24, June 2025; sections 8.1.5–8.1.5.C.2 used as conceptual transportation background, not Seattle residential specifications · Checked Oct 5, 2026
Check the current official source.

This article is general research guidance, not engineering, legal or permitting advice. Site conditions and rules vary.